Application
Cryptzo Engineering’s clean agent fire suppression system provides superior fire protection for a wide range of applications from sensitive electrical equipment to industrial hazards using flammable liquids in storage space. These agents leave no residue, thus eliminating costly after-fire clean-up, and reducing “down-time” to a minimum with waterless fire protection.
DATA PROCESSING
Innovation in speed and capacity of data processing hardware has exponentially increased the ability to store critical data. This has led to widespread use of electronic data storage and the expansion of data centers. Due to which the data centers have to run 24×7 which leads to an increase in overheating and fire scenarios.
- Data Center
- UPS Room
- Electrical Room
- Sub-floors Area
COMMUNICATIONS
Electronic communication is so portable, reliable and instantaneous that they are taken for granted. The equipment that provides such communication is heavily used and could overheat. Data management and communication hubs could be prone to fire.
- Switching Equipment
- Power & Battery Area
- Cell Sites
- Standby Engine Area
OIL & GAS
Oil refinery operators perform a range of tasks from the control room. They monitor the processes remotely through electronic representations shown on monitors. Operators make sure that processes keep running as per SOP. They are responsible to take appropriate actions in case of irregularities or emergencies. Therefore, control room and control system equipment are vital to safe operations in a facility that handles processes within refinery. Clean agent suppression system extinguishes fire without causing harm to the control room equipment.
- Control Room
- Metering Stations
OTHERS
Cryptzo Engineering offers a wide range of proven technologies to serve the diverse needs of virtually every industry. The list below is a representation of the countless industries we protect.
- Museums & Archives
- Police & Military
- On & Off Road Vehicle
- Airports
- Chemical Laboratories & Many More..
Factory & Filling Station - India
- Mangaon, Maharashtra, India
Assembling & Filling Station - International
- Al Hamra Industrial Zone-FZ, RAK, United Arab Emirates.
Subscribe To Our Newsletter
Stay in touch with us to get latest news and special offers.
We, at Cryptzo Engineering Pvt. Ltd. will strive to continually improve quality of our products and services, to satisfy the needs of our customer and will adhere to the work schedule on time and will comply all legal requirements. We will achieve this by continually improving the effectiveness of the quality management system and by minimizing organizations risks.
Contact Info
Cryptzo Engineering Pvt. Ltd.
505 & 506, Kesar Solitaire, Plot No. 88, Palm Beach Rd, Sector 19, Sanpada, Navi Mumbai, Maharashtra – 400705, India